FOOD PROCESSING
Platinum Industrial was hired to install a new line of equipment for a major food manufacturer.
- 6-week shutdown
- Demo/Removal of 180 pieces of existing equipment, weighing as much as 80,000 lbs
- Removal of existing conveying lines, piping and large sections of concrete flooring
- Installation of 300 pieces of equipment, eight conveying lines, pumps, kettles, case packers, industrial freezer, water treatment facility, process piping and concrete
With such a large quantity of equipment being installed, layout and systematic installation was a large part of the project and our attention to detail proved to be instrumental in the project’s success.
Tthe project consisted of a team of 24 millwrights and 10 pipefitters.
The project’s success can be attributed to Platinum Industrial’s attention to detail and knowledgeable team of skilled and dedicated craftsmen.