Process Line Equipment Demo & Installation

Platinum Industrial was hired to install a new line of equipment for a major food manufacturer. The project consisted of the removal of approximately 180 pieces of existing equipment, weighing as much as 80,000 lbs, removal of existing conveying lines, piping and large sections of concrete flooring.

With such a large quantity of equipment being installed, layout and systematic installation was a large part of the project and our attention to detail proved to be instrumental in the project’s success. The project also included the installation and erection of approximately 300 pieces of equipment, eight conveying lines, pumps, kettles, case packers, industrial freezer, water treatment facility, process piping and concrete.

Overall the project consisted of a team of 24 millwrights and 10 pipefitters and was completed safely and one week ahead of the scheduled six-week down. The project’s success can be attributed to Platinum Industrial’s attention to detail and knowledgeable team of skilled and dedicated craftsmen.

Bin Replacement & Structural Upgrades